What changes are being made at Spa? The latest on developments

What changes are being made at Spa? The latest on developments

 

 

F1 Live F1 Replay F1 Standings

 
The 7.004km venue is being modified with the objective of meeting double FIA/FIM official approval to allow for the return of motorcycle racing at the circuit. In order to stage the returning Spa 24 Hours motorbike race in June, work including the expansion of run-off areas and the installation of gravel traps is being completed during the off-season to receive the required FIM Grade C approval. Construction began on November 15 as part of an €80m government-backed refurbishment that will also see the circuit’s ageing infrastructure receive a welcome makeover. The world famous Eau Rouge/Raidillon section is undergoing changes that are set to increase safety for car racing following several serious accidents in recent years in Formula 2, W Series and the Spa 24 Hours. Related Apple set to win race for F1 movie project starring Brad Pitt Aston Martin F1 announces departure of CEO Szafnauer 16.12.2021_logo_16.jpeg What work is being done? La Source (Turn 1) The run-off area at La Source, the first corner of the circuit, is being enlarged, while a gravel trap is also being added. In addition, the 24hr grandstand will be replaced by a new more modern grandstand that the circuit claims will be “better integrated with its environment”. Related Williams overachieved F1 expectations in 2021 – Capito Haas crew “never gave up” despite struggles of 2021 F1 season – SteinerEau Rouge and Raidillon (Turn 2-4) The rails at the foot of the uphill climb (Turn 2) are being removed to allow for an enlargement of the tarmac run-off area. The left part of Raidillon (Turn 3) will also make way for a larger run-off. The run-off area located to the right-hand side of the track at the top of Raidillon (Turn 4) section is also being expanded. A covered grandstand with 4,600 seats and VIP boxes is being erected at the top of Raidillon. This is scheduled to be completed by the end of April. “4Les Combes and Malmedy (Turn 6 and 7) 22.12.2021_logo_18.jpeg The run-off areas at Les Combes (Turn 6) and Malmedy (Turn 7) will also be enlarged, with the rails moved and the tarmac replaced by a gravel trap. New service roads will be installed. Bruxelles (Turn 8) The sweeping, downhill right hander of Bruxelles (Turn 8) will have some of its tarmac run-off replaced by a gravel trap.Blanchimont (Turn 16 and 17) Gravel beds will also be added to the tarmac run-off at the high-speed Turn 16 and 17 segment, while a new service road will be created. 10.12.2021_logo_06.jpeg  

For motorsport news follow TRmotosports on social media.

Bir yanıt yazın

E-posta adresiniz yayınlanmayacak. Gerekli alanlar * ile işaretlenmişlerdir